Building Consent Process

Building Control and Consent Guide Version 2
Please view here

Steps in the process
Lodge your completed building consent application including all required information, documentation and the lodgement fee.
The council issues a Project Information Memorandum (PIM), if requested, advising if there are site specific hazards and whether a resource consent is needed.
Your building consent application is processed during which further information may be requested.
The council issues building consent (advising if resource consent required if not done previously). All actual processing charges must be paid before uplifting the building consent.
Building work must commence within 12 months from the date the building consent was issued. Book building inspections required as indicated in the conditions document.
Building work must be completed within two years from the date the building consent was granted. Apply for a code compliance certificate before the final inspection. Additional inspections required are charged and bonds are refunded.
 

How long will it take to process my application?
We are required and aim to process your application within 20 working days.

However, if we need to ask you for further information the clock stops until you provide us with that information. If that happens your application will take longer than 20 working days to process. We ask for further information when your application is not as clear as it could be. Therefore, it is important that your application is as detailed as possible and includes all the information we ask for.

If you are not able to show that your proposed building work will meet the requirements of the Building Act and the Building Code, we may be unable to issue you with a building consent.

When will my consent be issued?
Once we are satisfied that the consent meets all of the required criteria the consent and/or PIM will be granted and issued. You (or someone nominated by you) will be advised that the building consent is ready to be picked up.

You will need to pay all outstanding processing charges before your building consent will be issued.

What are building consent conditions?
These are conditions imposed on the building consent to ensure compliance with certain requirements of the Building Act. We will also indicate specific requirements relating to your building project that must be followed or adhered to during the construction of your project.

It is very important that you (and your contractors) read the building consent documentation to ensure you are clear about the requirements. It will contain a list of inspections required to be undertaken by council staff during the building process, and a list of producer statements (if applicable) required from specialists (typically engineering disciplines). The identified specialists will be required to provide documentation of the inspections they undertake in support of their producer statement.

How long is my building consent valid for?
Work must start on your project within 12 months after the date the consent was issued.

If we have not done any inspections before then, we will send you a letter reminding you that work must be started and asking if you intend to proceed with the work. You may decide that you will not do the work, in which case the consent will lapse, or you may apply for an extension of time to start the work. An extension of time to start work may be granted in some circumstances after we have reviewed the building consent file.

If we do not hear from you within the stated time, or an extension is refused, the consent will lapse. This means that a new consent would have to be applied for and issued before any work can be carried out.

 

Information on this page has been sourced from Auckland City Council.